How to extract data from an MPP file

 Post Reply Post Reply
Author
abyjose View Drop Down
Newbie
Newbie


Joined: 20 January 2005
Location: Indonesia
Status: Offline
Points: 1
Post Options Post Options   Thanks (0) Thanks(0)   Quote abyjose Quote  Post ReplyReply Direct Link To This Post Topic: How to extract data from an MPP file
    Posted: 21 January 2005 at 12:02am
Hi,
How to Access the content of Microsoft Project Planning(MPP)
Files from ASP.NET application.

                &nbs p;     Please let me know if you know how to deal with it
Back to Top
michael View Drop Down
Senior Member
Senior Member
Avatar

Joined: 08 April 2002
Location: United States
Status: Offline
Points: 4670
Post Options Post Options   Thanks (0) Thanks(0)   Quote michael Quote  Post ReplyReply Direct Link To This Post Posted: 21 January 2005 at 12:39pm
It's not really hard if you have Project Server, with a project file you need to reference the project api ( I think there is an SDK) and simply do something like
Dim oApp As New MSProject.Application()
oApp.FileOpen("C:\Testproject.mpp", False)

Basically the same as any office interop would do too I guess.
Back to Top
dpyers View Drop Down
Senior Member
Senior Member


Joined: 12 May 2003
Status: Offline
Points: 3937
Post Options Post Options   Thanks (0) Thanks(0)   Quote dpyers Quote  Post ReplyReply Direct Link To This Post Posted: 21 January 2005 at 8:37pm
If you don't have Project Server, you might try exporting the mpp file from project in excel format and working with that.

Lead me not into temptation... I know the short cut, follow me.
Back to Top
michael View Drop Down
Senior Member
Senior Member
Avatar

Joined: 08 April 2002
Location: United States
Status: Offline
Points: 4670
Post Options Post Options   Thanks (0) Thanks(0)   Quote michael Quote  Post ReplyReply Direct Link To This Post Posted: 22 January 2005 at 10:47am
Well I assume he wants to operate the project file as in updating stuff, would not help much then. Interop should work fine...
Back to Top
dpyers View Drop Down
Senior Member
Senior Member


Joined: 12 May 2003
Status: Offline
Points: 3937
Post Options Post Options   Thanks (0) Thanks(0)   Quote dpyers Quote  Post ReplyReply Direct Link To This Post Posted: 22 January 2005 at 7:45pm
Actually, I didn't think about that. I've been using a DNN PM package lately that imports/exports excel formatted stuff for Project so I was kind of focused on that way - lol.

Lead me not into temptation... I know the short cut, follow me.
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.08
Copyright ©2001-2026 Web Wiz Ltd.


Become a Fan on Facebook Follow us on X Connect with us on LinkedIn Web Wiz Blogs
About Web Wiz | Contact Web Wiz | Terms & Conditions | Cookies | Privacy Notice

Web Wiz is the trading name of Web Wiz Ltd. Company registration No. 05977755. Registered in England and Wales.
Registered office: Web Wiz Ltd, Unit 18, The Glenmore Centre, Fancy Road, Poole, Dorset, BH12 4FB, UK.

Prices exclude VAT at 20% unless otherwise stated. VAT No. GB988999105 - $, € prices shown as a guideline only.

Copyright ©2001-2026 Web Wiz Ltd. All rights reserved.